Resources

Camus Blog
Camus wins top honors at Data Center World for FlexConnect, our software solution helping data centers connect to the grid faster—with lower costs and emissions.
Discover how data centers can beat long interconnection timelines with flexible interconnection—speeding up access to grid power while lowering costs and emissions.
VEC and Camus showcase how dynamic EV charging can prevent overloads, avoid costly upgrades, and unlock higher grid utilization -- with details on their transformer-constrained pilot.
Learn how flexible interconnection enables faster grid connections by adapting to real-time constraints.

Case Studies & White Papers

Case Study
Kit Carson Electric Cooperative
When Kit Carson Electric Cooperative (KCEC) announced the ambitious goal of achieving 100% daytime solar by the end of 2022, they needed to improve visibility and control over grid assets to effectively scale up renewable capacity.

Subscribe to Camus’ Newsletter

Receive the best online resources for utility leaders and grid operators. Articles, whitepapers and case studies that help you manage your grid. No fluff!