Resources

Camus Blog
Camus wins top honors at Data Center World for FlexConnect, our software solution helping data centers connect to the grid faster—with lower costs and emissions.
Discover how data centers can beat long interconnection timelines with flexible interconnection—speeding up access to grid power while lowering costs and emissions.
VEC and Camus showcase how dynamic EV charging can prevent overloads, avoid costly upgrades, and unlock higher grid utilization -- with details on their transformer-constrained pilot.
Learn how flexible interconnection enables faster grid connections by adapting to real-time constraints.

Case Studies & White Papers

Case Study
Vermont Electric Cooperative
When Vermont Electric Cooperative (VEC) saw rising EV adoption and mounting transformer strain, they partnered with Camus to pilot grid-aware charging and build a data foundation for flexible DER management.

Subscribe to Camus’ Newsletter

Receive the best online resources for utility leaders and grid operators. Articles, whitepapers and case studies that help you manage your grid. No fluff!