Get grid power years sooner
With FlexConnect, data centers secure access to utility power 3-5 years sooner using flexible gird connections that keep your site grid-powered during 99% of hours.
Real results from a PJM-area utility and Google
In a study with a major PJM-area transmission operator, supported by Google, FlexConnect demonstrated how flexible grid connections can safely accelerate hyperscale data center projects using only existing grid capacity.
Flexible grid connections cut interconnection timelines by up to five years.
Sites could serve 1.5X–3X more demand without waiting for grid upgrades.
Flexible sites remain fully grid-powered for all but ~30–70 constrained hours per year.
Projects stall even when grid capacity exists
Multi-year delays
Limited view of grid capacity
Rising upgrade costs
Expensive siting uncertainty
How FlexConnect gets you to power faster
FlexConnect determines how much load the grid can serve today and sets guaranteed and flexible capacity levels so your project can interconnect before upgrades are built.
Pre-Interconnection
Define how much of your service is guaranteed and when flexibility is required.
Post-Interconnection
Use grid power 99% of the year and on-site resources during rare grid constraints.

Get connected sooner without compromising 99.999% uptime
FlexConnect accelerates grid access by coordinating on-site or nearby resources during rare grid constraints. Your data center continues operating normally.
Get power years sooner
Flexible interconnection lets your site energize without waiting on long-lead grid upgrades.
Serve more at your site
FlexConnect reveals how much more demand your site can support by pairing utility service with on-site flexibility, using real utility data.
Maintain five-9s uptime
Flexible grid connections don't impact compute demand; your site runs normally as on-site resources respond automatically to grid constraints.
Trusted by utilities, chosen by data centers
Camus combines deep utility and data center expertise with industry-leading grid analytics. Developed with partners like PPL and Google, FlexConnect gives developers a clear path to secure power sooner while protecting grid reliability.
Trusted by utilities
Built with utility partners and validated against real planning tools, FlexConnect is the platform utilities trust for flexible grid connections.
From study to operations
From defining flexibility requirements to operating within grid limits, Camus helps developers stay aligned with utilities from planning through operations.
Flexibility partners
Camus works with a growing network of flexibility providers whose technologies respond to operating limits, helping developers quickly identify solutions that meet utility requirements.
Deep utility expertise for faster interconnection
Every utility approaches large load interconnection differently. Camus helps developers navigate these processes: identifying the right utilities, securing the data needed for flexibility analyses, and moving projects through interconnection faster.
Deployed at utilities serving 22 GW of peak demand
Structured utility engagement to enable flexible connections
New utility deployments completed in ~12 weeks, enabling rapid study execution

Ready to secure power sooner?
See how FlexConnect helps data centers secure reliable power faster through flexible grid connections.